AC MAGNETO
REMOVAL
1. Remove:
•
Bolts 1
•
Starter pulley 2
•
Nut 3
NOTE:
Attach the primary sheave holder to hold the
primary sheave.
SDN5520
Primary sheave holder:
2. Remove:
•
Magneto rotor 1
NOTE:
•
Remove the magneto rotor using the rotor
puller 2.
•
SDN5530
Fully tighten the tool holding bolts, making
sure the tool body is parallel with the magneto
rotor. If necessary, one screw may be backed
out slightly to level the tool body.
Rotor holding puller:
5-24
ENG
90890-01701, YS-01880
90890-01362, YU-33270