2

Site preparation overview

Introduction
Before the product is delivered, you must prepare the site according to the instructions
in this chapter.

Select the site

Select a site that complies with national and international requirements for biosafety.

General site requirements

The following requirements must be fulfilled at the location where the ÄKTAprocess
system will be installed:
ÄKTAprocess Site Preparation Guide 29-1396-55 AA
WARNING
Spread of biological agents. The operator must take all necessary
actions to avoid spreading hazardous biological agents. The facility
must comply with the national code of practice for biosafety.
ÄKTAprocess is intended for indoor use only
The system units must not be installed in a dusty environment
The system units must not be exposed to sources of heat, such as direct sunlight
The system units must not be exposed to strong magnetic or electrical fields
The system units must not be exposed to vibrations
The system units must not be exposed to corrosive gas
2 Site preparation overview
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ÄKTAprocess and is the answer not in the manual?

Questions and answers

Table of Contents