5 Run
Note To download the project into USB for operation (NB
-TW01B supporting this function), refer to 6-1-5
Download to USB1 in NB-Designer Operation Manual.
In this case, the exemplary project of garage door control system will work normally after the programs are
transferred to CP1E successfully by CX-Programmer and the project are downloaded into HMI successfully
by NB-Designer, as well as the NB Unit are connected with CP1E together with other devices according to
the requirements.
5-6
NB-series Programmable Terminals Startup Guide Manual(V109)