ALLIANCE A105 ARIES Installation Operation & Maintenance page 48

Table of Contents

Advertisement

Installation
28 kg / 70 lb. / 280 L Models (100G)
Voltage
Cycle
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415
50-60
440-480
50-60
380-415
50-60
440-480
50-60
28 kg / 70 lb. / 280 L Models (175G)
Voltage
Cycle
200-240
50-60
200-240
50-60
380-415 + N
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 22
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
Table 23  continues...
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.6
9.8
23.2
N/A
23.2
N/A
1.6
3.6
1.6
3.6
23.2
N/A
23.2
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.6
9.9
23.2
N/A
23.2
N/A
48
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
16
61 (21.9)
63
37.6 (21.9)
40
N/A
10
N/A
10
38 (21.9)
40
35 (21.9)
32
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
16
61 (21.9)
63
37.6 (21.9)
40
Part No. D1634ENR4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents