ALLIANCE A105 ARIES Installation Operation & Maintenance page 44

Table of Contents

Advertisement

Installation
Voltage
Cycle
440-480
50-60
380-415
50-60
440-480
50-60
380-415
50-60
440-480
50-60
18 kg / 40 lb. / 180 L Models (100G)
Voltage
Cycle
200-240
50-60
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415 + N
50-60
380-415
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 17
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
Table 18  continues...
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
0.85
4.2
9.8
N/A
9.8
N/A
12.8
N/A
12.8
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
0.85
7.4
12.7
N/A
18.7
N/A
12.7
N/A
18.7
N/A
0.85
3.1
44
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
10
17.2 (9)
20
15.9 (9)
16
21.5 (12)
25
20 (12)
25
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
10
36 (12)
40
51.2 (18)
63
23.3 (12)
25
31 (18)
32
N/A
10
Part No. D1634ENR4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents