ALLIANCE A105 ARIES Installation Operation & Maintenance page 43

Table of Contents

Advertisement

Voltage
Cycle
380-415
50-60
440-480
50-60
14 kg / 30 lb. / 135 L Models
Voltage
Cycle
120
60
200-240
50-60
200-240
50-60
200-240
50-60
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415 + N
50-60
380-415
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 16
Phase
Wire
1
2
1
2 (L1, L2, or
L1, N)
1
2 (L1, L2 or
L1, N)
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
Table 17  continues...
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
12.6
N/A
12.6
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
0.85
13.3
0.85
7.2
3.9
N/A
5.5
N/A
9.8
N/A
12.8
N/A
9.8
N/A
12.8
N/A
0.85
4.2
43
Installation
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
21.3 (12)
25
20 (12)
25
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
20
N/A
10
18.8 (3)
20
25.8 (4.6)
32
28.5 (9)
32
36 (12)
40
17.6 (9)
20
22.5 (12)
25
N/A
10
Part No. D1634ENR4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents