ALLIANCE A105 ARIES Installation Operation & Maintenance page 46

Table of Contents

Advertisement

Installation
Voltage
Cycle
440-480
50-60
380-415
50-60
440-480
50-60
380-415
50-60
440-480
50-60
24 kg / 55 lb. / 240 L Models (100G)
Voltage
Cycle
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415
50-60
440-480
50-60
380-415
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 19
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 20  continues...
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.2
3.3
12.9
N/A
12.9
N/A
18.9
N/A
18.9
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.2
9.1
19
N/A
19
N/A
1.2
3.3
1.2
3.3
19
N/A
46
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
10
20.7 (12)
25
19.4 (12)
25
29.7 (18)
32
27.4 (18)
32
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
16
53 (18)
63
31.7 (18)
32
N/A
10
N/A
10
30 (18)
32
Part No. D1634ENR4