ALLIANCE A105 ARIES Installation Operation & Maintenance page 47

Table of Contents

Advertisement

Voltage
Cycle
440-480
50-60
24 kg / 55 lb. / 240 L Models (175G)
Voltage
Cycle
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415
50-60
440-480
50-60
380-415
50-60
440-480
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
3
3 (L1, L2,
L3)
Table 20
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 21
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
19
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.6
9.2
19
N/A
19
N/A
1.5
3.4
1.5
3.4
19
N/A
19
N/A
47
Installation
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
28 (18)
32
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
16
53 (18)
63
31.7 (18)
32
N/A
10
N/A
10
30 (18)
32
28 (18)
32
Part No. D1634ENR4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents