ALLIANCE A105 ARIES Installation Operation & Maintenance page 45

Table of Contents

Advertisement

Voltage
Cycle
440-480
50-60
380-415
50-60
440-480
50-60
380-415
50-60
440-480
50-60
18 kg / 40 lb. / 180 L Models (175G)
Voltage
Cycle
200-240
50-60
200-240
50-60
200-240
50-60
380-415 + N
50-60
380-415 + N
50-60
380-415
50-60
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Phase
Wire
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
Table 18
Phase
Wire
1
2 (L1, L2, or
L1, N)
3
3 (L1, L2,
L3)
3
3 (L1, L2,
L3)
3
4 (L1, L2,
L3, N)
3
4 (L1, L2,
L3, N)
3
3 (L1, L2,
L3)
Table 19  continues...
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
0.85
3.1
12.7
N/A
12.7
N/A
18.7
N/A
18.7
N/A
Hot and
Cold Wa-
ter Inlet
Valves
Total
power
Full Load
(kW)
Amps
1.2
9.1
12.9
N/A
18.9
N/A
12.9
N/A
18.9
N/A
1.2
3.3
45
Installation
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
10
20.5 (12)
25
19.2 (12)
25
29.5 (18)
32
27.2 (18)
32
Electric
Heat
Full Load
Amps
(Electric
Heating
kW)
Fuse (A)
N/A
16
36.2 (12)
40
53 (18)
63
23.5 (12)
25
31 (18)
32
N/A
10
Part No. D1634ENR4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents