Adhesive Mounting Installation - Renishaw T101 Installation Manual

Rslm/relm high accuracy linear encoder system
Table of Contents

Advertisement

Adhesive mounting installation

1
Thoroughly clean and degrease
the substrate with a
lint-free cloth.
Clean underside of scale using approved solvents
(see 'Storage and handling').
4
Thoroughly mix and apply epoxy then
remove remaining backing liner.
Area for
RGG-2 epoxy
5
Locate scale against dowels or ledge
and rotate down onto substrate.
Press down with firm
finger pressure.
TONiC RSLM/RELM installation guide
2
Mark area for epoxy on
adhesive tape.
6
Support
dowels
Mounting ledge
3
Remove backing liner from one side
and stick to underside of scale.
7
8
or
Allow 24 hours for epoxy to cure fully, then
clean scale using Renishaw scale wipes
(A-9523-4040) or a clean, dry, lint-free cloth.
Remove excess
epoxy
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents