Scheduled Maintenance - Scotchman CPO 350 Manual

Variable speed cold saw
Table of Contents

Advertisement

5.3 SCHEDULED MAINTENANCE

A program of scheduled maintenance should be set up and documented according to your application and
the frequency you use this machine. The following is a list of some important things that should be
included in a scheduled maintenance program.
1. EVERY 250 HOURS OR 3 MONTHS:
Drain the coolant reservoir and flush it out. Refill the coolant reservoir with new coolant.
This will extend the life of the coolant pump considerably.
2. EVERY 500 HOURS OR 6 MONTHS:
Drain the gear lube from the saw head and flush with a petroleum product.
Refill the saw head with Mobil 600W Super Cylinder Oil or equivalent.
Gear lube is added to the saw by removing the draw handle or breather fitting from the top of the saw
head.
Check the condition of the pivot pins on the head and on the guard.
Check the complete saw for loose connections in the electrical and air systems.
If your saw is equipped with the power vise or power down feed options, SEE SECTIONS 7.1 THRU 7.2,
for additional information.
Since every application is different, each user must design and implement a scheduled maintenance
program that fits his applications.
PAGE 21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents