Hitachi G200 User Manual page 132

Hitachi truecopy
Hide thumbs Also See for G200:
Table of Contents

Advertisement

Path status
Port Rejected
Serial Number
Mismatch
Invalid Port
Communication
Failed
10-4
Hitachi TrueCopy® User Guide for Hitachi Virtual Storage Platform Gx00 and Fx00 Models
Description
The primary system
rejected the logical
path link control
function because all
logical path resources
in the primary system
are being used for
other connections.
The secondary
system's S/N does
not match the
specified S/N.
The specified local
storage system port
is in the following
status:
Not mounted.
The port attribute
is not Initiator.
A remote path is
already added.
The primary system
connected to the
secondary system
successfully, but
logical communication
timeout occurred.
Troubleshooting
Corrective action
includes cables, connectors, switches,
extender devices, communication lines,
and all other devices connected to the
extenders.
Delete all remote paths in the Remove
Remote Paths window.
Remove all remote storage systems
currently not in use in the Remove
Remote Connection window.
Make sure that you entered the correct
secondary system S/N and Controller ID,
and primary and secondary system port
numbers.
Make sure the primary and secondary
system ports are configured correctly.
Make sure that data path relay equipment
is properly configured and functional. This
includes cables, connectors, switches,
extender devices, communication lines,
and all other devices connected to the
extenders.
Make sure that no remote path between
the local and remote storage systems
with the same port number settings is
already added.
Make sure that you entered the correct
secondary system S/N and Controller ID,
and primary and secondary system port
numbers.
Make sure that the primary and
secondary system ports are configured
correctly.
Make sure that data path relay equipment
is properly configured and functional. This
includes cables, connectors, switches,
extender devices, communication lines,
and all other devices connected to the
extenders.
Make sure that the secondary system port
and the relay equipment are configured
correctly.
Make sure that data path relay equipment
is properly configured and functional. This
includes cables, connectors, switches,
extender devices, communication lines,
and all other devices connected to the
extenders.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G600G400G800F400F600F800

Table of Contents