Planned Outage Of Both Primary And Secondary Systems - Hitachi G200 User Manual

Hitachi truecopy
Hide thumbs Also See for G200:
Table of Contents

Advertisement

Planned outage of both primary and secondary systems

When you plan an outage of the TrueCopy primary and secondary systems at
the same time, the primary system must be powered off first and then
powered on last.
To perform a planned outage of the primary and secondary systems
1
Perform the planned outage of the primary system first. Because a
.
planned outage does not affect pairs, nothing out of the ordinary must be
done regarding the TC system or operations.
2
If a secondary system to be powered off is connected to a primary system
.
that is not powered off, split the pairs before powering off the secondary
system. Confirm that the pair status changes.
3
Perform the planned outage of the secondary systems as described in
.
Planned outage of the secondary system or remote path on page
4
Power on the secondary systems. Make sure that they are fully
.
operational and ready to resynchronize operations before powering on the
primary system.
5
Power on the primary system, and make sure it is ready to resynchronize
.
operations. If you split any pairs in step 2, you can also resynchronize
those pairs now.
Hitachi TrueCopy® User Guide for Hitachi Virtual Storage Platform Gx00 and Fx00 Models
Monitoring and maintaining the TC system
7-20.
7-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G600G400G800F400F600F800

Table of Contents