Operating instructions KA 15 / 20 / 30
CAUTION!
File:BA_KA15_9704836_EN_1992-01-01.docx
Änderungen in Ausf ührung und Konst ruktion v orbehalten. / W e reserv e the right t o change execution and const ruction. / Nous no us reserv ons le droit de changer l´éxécution et la construction.
MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
6
Delivery, transport, installation and assembly
6.1
Delivery
Check that the delivery is complete immediately after receiving it by comparing it with
MEIKO's contract confirmation and/or the delivery note.
If necessary, complain about any missing parts immediately to the shipping company and
notify MEIKO.
Check the entire installation for any damage that may have occurred during shipping.
In the event of any transport damage, please inform MEIKO immediately in writing, and
also send a photo of the damaged parts to us.
6.2
Transport and installation
In order to avoid damage to the machine and life-threatening injuries when shipping the
system, the following points must be observed:
- Transport works must only be executed by qualified personnel under observance of
the safety rules.
In order to ensure safe shipping, the system components are placed on a special square
wooden frame.
Incoming goods should only arrive on these wooden frames. This is specifically designed
to enable safe and secure transport using two pallet trucks.
pallet truck
Transport with pallet trucks only!!!
It is possible to negotiate gentle curves if the pallet trucks are not positioned completely
under the wooden bearers
valid from: 2011-03-01
Update: 2013-06-17, S. 3-12, 31, 35
pallet truck
9704836
12/58