Storing Machine - Mytee -Lite II 8020 User And Parts Manual

Table of Contents

Advertisement

WEEKLY MAINTENANCE
(EVERY 20 HOURS OF OPERATION)
1. Flush solution system with Mytee system
maintainer to dissolve normal chemical buildup.
a.
Pour 7.5L (2 gal) of hot water 60°C (140°F)
into solution tank. Add Mytee system
maintainer according to mixing instructions
on bottle
FOR SAFETY: When using machine,
follow mixing and handling instructions on
chemical containers.
b.
Operate machine for one minute.
c.
Shut off machine and allow
remaining solution to break down
chemical buildup overnight.
d.
Next day, spray out remaining
solution and flush system with
11L (3gal) of clean water.
2. Inspect vacuum hoses for holes and loose cuffs.
3. Inspect spray pattern for clogging. If clogged,
remove spray tips and soak them in a
recommended liquid neutralizer for up to six
hours. To remove spray tip, twist spray tip body
counter-clockwise. Do not use pointed objects to
unplug tips, damage will occur.
4. Lubricate wheels with water resistant oil.
5. Inspect machine for water leaks and loose
hardware.
6. Remove float shut-off screen from recovery
tank and clean.
NOTE: The float shut off screen is not glued on.
Simply pull it off.

STORING MACHINE

1.
Before storing machine, be certain to completely drain and
rinse tanks of all water and solution.
2.
Drain and dry the vacuum hose as well, using the drain
hose provided
3.
Store machine in a dry area in the upright position.
4.
Open recovery tank cover to promote air circulation.
ATTENTION: Do not expose to rain. Store indoors.
ATTENTION: If storing machine in freezing temperatures,
be sure that machine and solution system are completely
drained and dry.
www.mytee.com
MYTEE-LITE II
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents