System B: Multi - Daikin ERQ Service Manual

Erq 100/125/140 a7v1b (outdoor unit) ekeqd/f/mcbv3 (control box) ekexv 50/63/80/100/125/140 (expansion valve kit)
Hide thumbs Also See for ERQ:
Table of Contents

Advertisement

Different Systems with their Control Boxes
Allowable lengths and heights
System A:
Allowable height:
AHU
EXV-kit
outdoor
ERQ
1 phase
1.2

System B: MULTI

Only for combining VRV + AHU + indoors. No ERQ!
System B = MULTI (suction control) : VRV + EXV-Kit
VRV
H/P
Multi application with VRV means the ability to combine 1 outdoor unit + several AHU, as well
as VRV indoors (minimum 1 is required). The required control box for this application is
EKEQM.
46
EXV-kit
Control Box
ERQ
(D or F - type)
DDC
5 m
A
100
125
length: 5 < A
140
EKEQMCB
EKEXV-KIT
EKEQMCB
EKEXV-KIT
VRV indoor 1
VRV indoor n
AHU
Total system:
30 m
(outdoor unit can be above
or below the AHU)
Piping
B
C
50 m
length:
5 m
100 m
AHU
Field supply
AHU
Qty of
EKEXV - kits
is limited by
connection
ratio.
: http://splitoff.ru/tehn-doc.html
ESIE09-05
Communication
D
E
F
depend on
20 m
20 m
DDC
Control Box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents