Method Of Replacing The Inverter's Power Transistors Modules - Daikin ERQ Service Manual

Erq 100/125/140 a7v1b (outdoor unit) ekeqd/f/mcbv3 (control box) ekexv 50/63/80/100/125/140 (expansion valve kit)
Hide thumbs Also See for ERQ:
Table of Contents

Advertisement

ESIE09-05
6. Method of Replacing the Inverter's Power
Transistors Modules
Checking failures in power semiconductors mounted on inverter PC board
Check the power semiconductors mounted on the inverter PC board by the use of a multiple
tester.
<Items to be prepared>
• Multiple tester : Prepare the digital type of multiple tester with diode check function.
<Preparation>
• Turn OFF the power supply. Then, after a lapse of 10 minutes or more, make measurement
• To make measurement, disconnect all connectors and terminals.
ERQ 100/125/140 A7V1B
C+
C–
Appendix
of resistance.

Method of Replacing the Inverter's Power Transistors Modules

: http://splitoff.ru/tehn-doc.html
W
V
U
235

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents