v N6210 2858-C20, N6240 2858-C21, N6220 2858-C25, and N6270 2858-C22
v N6240 2858-E21, N6220 2858-E25, N6250 2858-E26, and N6270 2858-E22:

Rules for installing the system in a rack

Attention: The rack installation instructions provided in this document and in the
Installation and Setup Instructions for your N series product apply specifically to the
installation of the N series product in an IBM 19-inch rack. IBM service personnel
cannot install the N series product in a non-IBM rack.
If the N series product is being installed in a non-IBM rack, the rails shipped with
the N series product may or may not work with the non-IBM rack. Physical
installation of the N series product in a non-IBM rack is the customer's
responsibility.
You need to observe the following rules and restrictions when installing an N6200
series system in a standard IBM 19-inch (48.26 cm) equipment rack with mounting
rails:
10
IBM System Storage: N6200 Series Hardware and Service Guide
– 1 console adapter cable, RJ-45 to DB-9
– 4 cable management arms (two per controller node, and two per IOXM)
– 1 ESD wrist strap
– 2 power cords
– 1 serial null modem cable
– 1 IBM rail kit
– 1 set of IBM publications
– 1 single-enclosure HA system with two controllers, containing any options
you ordered
– 2 console adapter cables, RJ-45 to DB-9
– 4 cable management arms (two per controller node)
– 1 ESD wrist strap
– 2 power cords
– 2 serial null modem cables
– 1 IBM rail kit
– 1 set of IBM publications
– 1 dual-enclosure HA system, containing any options you ordered. Each
enclosure ships in a separate container, and each enclosure contains one
controller and one Input/Output expansion module.
– 2 console adapter cables, RJ-45 to DB-9 (1 per enclosure)
– 8 cable management arms (two per controller node, and two per IOXM, for a
total of 4 per enclosure)
– 2 ESD wrist straps (1 per enclosure)
– 4 power cords (2 per enclosure)
– 2 serial null modem cables (1 per enclosure)
– 2 cluster connection cables (either SFP+ integrated copper cables or 10GbE
SFP+ transceivers with fiber cables, depending on your order)
– 2 IBM rail kits (1 per enclosure)