Figure 15. Installing the switch in a rack
2. Proceed to "Powering on the system."

Powering on the system

After you complete the physical installation of the system, you can power on the
system.
1. Ensure that all power supplies are fully and properly inserted and no power
2. Remove the power cord from the shipping package.
3. Attach the AC power cable to the AC connector on the rear panel.
4. Insert the power cable plug into a 115V/120V outlet.
supply slots are uncovered.
Attention: Never leave tools inside the device.
Note: To turn the system off, simply unplug the power cord(s).
Note: The socket should be installed near the equipment and should be easily
accessible.
Note: If the outlet is not rated 115/120V, stop and get the appropriate cable for
the outlet.