16. Select the Install new software first option from the displayed menu.
Please choose one of the following:
(1) Normal Boot
(2) Boot without etc/rc.
(3) Change password.
(4) Clean configuration and initialize all disks.
(5) Maintenance mode boot.
(6) Update flash from backup config.
(7) Install new software first.
(8) Reboot node.
Selection (1-8)? 7
This menu option downloads and installs the new Data ONTAP image to the
boot device.
Note: During the software install process, you are prompted for the URL of
the image.tgz file. Enter the path as follows:
http://path_to_the_web-accessible_directory/image.tgz
17. Enter y when you see the following prompt:
This procedure is not supported for Non-Disruptive Upgrade on an HA pair.
Do you want to continue? [y|no]y
18. Enter the path to the image.tgz when you see the following prompt:
What is the URL for the package? http://path_to_web-accessible_directory/image.tgz
19. Restore the backup configuration by entering y when you see the following
screen:
****************************************************************
*
Restore Backup Configuration
* This procedure only applies to storage controllers that
* are configured as an HA pair.
*
* Choose Yes to restore the "varfs" backup configuration
* from the SSH server. Refer to the Boot Device Replacement *
* guide for more details.
* Choose No to skip the backup recovery and return to the
* boot menu.
****************************************************************
Do you want to restore the backup configuration
now? {y|n}
y
Start the restore_backup procedure on this node's HA partner.
The restore configuration has been copied
from the HA partner to this node.
Would you like to use this restored copy
now? {y|n}
20. Copy the varfs.tgz file from the HA partner node to the target node by
entering the following command from the partner node console:
system node run -node partner_node_name -command restore_backup
target_node.netboot_IP.address
Use the same IP address that was used for the netboot command.
21. Finish the restore backup on the target node by entering y when you see the
following screen:
*
*
*
*
*
*
*
*
Replacing N6200 series system devices
83