Commissioning
The installer must complete the installation and commissioning checklist below
and make sure this guide is left with you. They must also instruct you in the use and
care of the appliance, and make sure you understand the safety instructions.
Checklist
F Appliance positioned in a suitable location (clearances, mantels, surrounds etc).
F Rinnai flue system installed and tested to ensure effective draw.
F Gas pressure checked and set.
F Burn media installed as per instructions.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
Installer details
Company name:
Installer name:
Address:
Phone:
Certificate of compliance number for installation:
Signed:
10 | Compact 2 Operation Guide: 11837-C 03-15
Mobile:
Date: