Installation Checklist; Installer Details - Rinnai FS 35 Operating And Installation Instructions

Table of Contents

Advertisement

INSTALLATION / COMMISSIONING CHECKLIST
(To be completed by certifi ed Gas Installer)
____________________
Model:
1. Was a fi replace inspection carried out?
(ie. clearances, combustibles etc.)
2. Was chimney inspected?
3. Did chimney require fl ue liner system to be installed?
If NO, did chimney meet specifi ed criteria as per manual?
4. Has specifi ed gas pressure been set?
5. Are decorative logs located correctly on pins?
6. Have ember granules been placed and free of dust and powder?
7. Has appliance been sealed around the fi replace?
8. Has the appliance been commissioned?
9. Is the end-user fully aware of operating procedure?
INSTALLER / GASFITTER DETAILS
Company Name: ____________________________________________________________________
Gasfi tters Name: ____________________________________________________________________
Address:____________________________________________________________________________
____________________________________________________________________________
Phone: __________________________
Certifi cate of Compliance / Certifi cation Number: ______________________________________
Signed: _________________________________
Mobile: ____________________________
Date: ______________________________
12
NO
YES
Part Number 7289 Aug.08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents