Mira Elite ST Installation Manual page 14

Electric showers 9.8, 10.8 kw
Hide thumbs Also See for Elite ST:
Table of Contents

Advertisement

10.
Connect supply pipe. Do not
overtighten!
12.
Firmly connect the conductors. Do
not exert strain on the terminal
block.
14.
Refit the Service Tunnel and Cover.
Make sure they fit correctly.
Do not overtighten screws.
Having completed the installation make sure the user is familiar with the operation
of the appliance.
11.
13.
L = BROWN
E = GREEN
N = BLUE
15.
14
Feed cable into Case. Fit Earth
sleeve (not supplied) and strip
insulation.
Do not twist cable cores.
Make sure wires are clear of all
mounting holes.
Medium
Low
Do not use alternative screws to
secure the Cover. This can cause
internal damage to the appliance.
Do not seal around the back of
appliance.
High

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents