Figure 3
1. Boom hinge spring
4. Repeat the procedure for each spring on both boom
hinges.
5. Move the booms into the transport "X" position; refer
to
Operating the Booms (page
2. Jam nut
32).
2
Removing the Shipping
Bumper
No Parts Required
Procedure
1. Remove the bolts. washers, and nuts that secure the
shipping bumper to the front chassis plate
1. Nut
2. Shipping bumper
2. Remove the shipping bumper from the machine
(Figure
4).
Note: Discard the bolts. washers, nuts, and shipping
bumper.
15
(Figure
Figure 4
3. Washer
4. Bolt
4).