Toro 34215 Operator's Manual page 29

Stand-on spreader/sprayer
Hide thumbs Also See for 34215:
Table of Contents

Advertisement

Figure 29
1. Locking sleeve
2. Gate cable
3. Ball stud
B. Pull the cable off the ball stud
Spreading Charts
Note: The cam setting tables for pellet material and the grass seed are provided with permission from the Brinly-Hardy
Company; reference the Brinly-Hardy Company website for more information.
These charts are to be used as an approximate guideline only. Other factors, such as weather conditions, spreader operation,
and the condition of material, will affect your results.
Cam Settings for Pellet Material Application
Type
Fine Pellets
Mixed Fine Pellets
Small Pellets
4. Drop-rate cam
5. Linkage
(Figure
29).
kg per 93 m
2
(lb per 1,000 ft
0.5 (1)
0.9 (2)
1.4 (3)
0.9 (2)
1.8 (4)
2.7 (6)
0.9 (2)
1.8 (4)
2.7 (6)
C. Rotate the drop-rate cam past the position 9 so
that the slot in the cam is aligned with the linkage
(Figure
29).
D. Fully push the linkage rearward
7. Allow the remaining material in the hopper to pour
into the shallow pan and then remove the pan.
8. Connect the hopper-gate cable as follows:
A. Pull the linkage out until it clears the drop-rate
cam
(Figure
B. Move the wide-distribution impeller-gate lever
forward.
C. Attaching the cable to the ball stud at the gate
lever(Figure
9. Assemble impeller onto the impeller shaft and secure
the impeller with the drive pin.
10. Align the holes in the front cover with the clip nuts
in the chassis and secure the cover with the 4 thumb
nuts that you removed in 3.
2
)
Cam Setting — One Pass
3.6
4.0
4.2
3.7
4.7
5.2
3
4.2
4.5
29
(Figure
29).
29).
Cam Setting — Two Passes
3.1
3.5
3.7
3.2
4.1
4.5
2.2
3.7
4
29).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents