Follow-up Procedure
Tighten the mounting screws to 8 in-lbs.
•
•
Connect the wires as shown below.
•
Make sure the wires are not routed under the motor.
•
Refer to the
replacement details.
•
Run the ribbon motor test in Diagnostics to verify the motor is functioning.
•
Print several test cards to verify the motor operates under a load.
6-28
Front Wire Routing
and
Functional Block Diagram
Removal and Replacement
for