Operation Preparation; Operation Methods Besides Commands From Operation Panel - Sanken SVCO6 Instruction Manual

Table of Contents

Advertisement

(3) Operation preparation

After confirmation of test run and normal operation confirmation of motor, please implement the
connection with the mechanical system.
1 Please set the function codes related to machine action.
2 Check the interface matched with peripheral mechanical equipment.
(4) Operation confirmation
Before delivery, various functions of the inverter have been set up as shown in the function code list.
If change of settings of operation command is required, please refer to [5-6 Basic Operation] for
implementation.

(5) Operation methods besides commands from operation panel

■Operation by commands from external signals
1 When controlling operation / stop according to external signals, please set the function code F1101 to 2,
that is, F1101 = 2.
If FR(Forward) signal is ON, then the inverter will drive to forward. If RR(Reverse) signal is ON, then the inverter
will drive to reverse. Moreover if RREV(Reverse revolution) is ON, then the inverter will drive to reverse
revolution from revolution direction command. Therefore if both input signals FR(Forward) and RREV(Reverse
revolution) are ON at the same time, then the inverter will drive to reverse. If both input signals RR(Reverse) and
RREV(Reverse revolution) are ON at the same time, then the inverter will drive to forward.
FR
RR
RREV
Frequency
2 When carrying out frequency setting by external potentiometer, 4
function code F1002 = 2
3 Please refer to [4-6 Connection Diagram of Control Circuit Terminals] for correct use of external signals.
Figure 6-2 External operation command action
20.
-
- 77 -
6-2
Test Run
Time
20mA, 0
10V etc., please set the
-
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents