Annexes; Decorative Pyramidal Dock Installation And Cladding Of Chimney Vent - J. A. Roby loo RGR-25 Installation And Operation Manual

Direct-vented
Hide thumbs Also See for loo RGR-25:
Table of Contents

Advertisement

11. ANNEXES

11.1. DECORATIVE PYRAMIDAL DOCK INSTALLATION AND CLADDING
OF CHIMNEY VENT
A decorative pyramidal dock is available to your local J.A. Roby dealer for the PAMPERO and the RGC-
25 configuration.
IMPORTANT: The dock have to be drop onto the fireplace right after installing the first vent section and
the 8 feet isolation sleeve. To keep access to screwing plate you have to put the dock onto a temporary
frame. We suggest 24 inch for the first section of vent to pass the dock over easily
It's important to put the weight of the frame and cladding on the fireplace and/or the ceiling.
N.B.: The dock can't support any weight and you have to keep ½ inches clearance around the
cladding and the pyramidal dock.
Because of heat concentration at the top of the dock, use only non-combustible material to build the
cladding and framing of the chimney vent. Like fire-resistant gypsum panel and metallic stud.
Put Protection over the dock to prevent scratching and damage.
76

Advertisement

Table of Contents
loading

Table of Contents