This task describes the CallPilot server installation.

CallPilot server installation tasks

The following is a list of tasks you perform to install the CallPilot server. To
link to detailed procedures for each task, click the text.

Rack-mounting the server

Perform the following procedure for four- or two-post rack-mounting.
The CallPilot server includes installation instructions for the 19" and 23"
Universal Rack Mount kits. Refer to the those instructions for more details.
Step
1
2
3
4
Copyright © 2007-2008, Nortel Networks
.
"Rack-mounting the server" (page 41)
"Installing peripheral devices" (page 42)
"Installing cables and grounds" (page 43)
"Performing preboot checks" (page 45)
"Connecting the server to power and starting it" (page 45)
Action
Attach the inner rail to the chassis on both sides.
Attach the front-tab mounting bracket to the chassis on both sides.
The bracket is reversible for a flush mount install.
Using the four outer studs, assemble the mounting brackets to the
outer rail. Insert the four thread covers of the 4 inner studs.
For a two-post install, flip the mounting brackets so they are facing in
to each other.
Tech tip: Hand-tighten the nuts at this stage so you can adjust the
distance for the server and rack.
Install the two outer rail subassemblies.
Eight mounting screws are required for a four-post install. For a
two-post install, six mounting screws are required.
Nortel CallPilot
Quickstart Guide

NN44200-313 01.02 Standard

5.0 19 May 2008
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Callpilot 5.0

Table of Contents