Toshiba satellite A20 series Maintenance Manual page 378

Hide thumbs Also See for satellite A20 series:
Table of Contents

Advertisement

4.30 Fluorescent Lamp
Check the condition after mating.
*Check the condition of the concave portion of
the FPC and the outline of the connector.
*Insert the FPC to the end. There shall be no
out of position in
*Lock surely the connector.
Fit the pin and the hole.
Screw
Figure 4-131 Replacing Sharp fluorescent lamp (SXGA+) (19)
Satellite A20 Maintenance Manual (960-444)
θ.
Fold the source board.
Fit the pin and the hole.
Screw tightening torque: 0.9kg•cm
4 Replacement Procedures
Out-of-position in θ: Failure
Poor mating: Failure
(G)
Fold the gate board.
Screw
Screw
Fit the pin and the hole.
Do not cover the
projection.
Screw
4-173

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents