RI
Fig. 3.15
Fig. 3.16
RI
Fig. 3.17
Fig. 3.18
Fig. 3.19
3.9
Filling the water circuit
Novella series boilers must be fitted with a
water circuit filling system connected to the
boiler return line (fig. 3.15).
- Make sure that the boiler drain cock is clo-
sed before attempting to fill the boiler (fig.
3.16)
- Open the water circuit shut-off cocks and
slowly fill the circuit until the pressure gauge
reads out a value of 1.5 bar (cold).
- Close the water circuit shut-off cocks (fig.
3.17).
3.10
Emptying the water circuit
- Turn the electricity supply off by switching
the boiler's mains power switch and con-
trol panel switch OFF (0) before starting to
empty the boiler (fig. 3.18).
- Make sure that the water circuit shut-off
cocks are closed.
- Connect a rubber hose to the hose union on
the boiler's drain cock and open the cock
(fig. 3.19).
19