INSTALLATION (See Figure 8D-1)
1. Install the pump, rotating it back and forth to en-
gage the splines, fasten the mounting plate.
2. Connect all control linkage. See Section 2 for prop-
er adjustments.
3. Install the implement pump.
SECTION 8D. TRACTION PUMP
8D-3
4. Connect all hydraulic hoses and tubes.
5. Install seat and seat pan.
6. Start the tractor and inspect for leaks, repair as
necessary.
HYDRAULICS
8D