Actions Against Troubles On 10Gbase-R - NEC IP8800/S2400 Series Troubleshooting Manual

Nec electronics america network hardware user manual
Table of Contents

Advertisement

No.
Troubleshooting Steps
2
According to the receiving error
statistical information displayed
by the show interfaces
command, check to see if the
statistical information below is
counted for the port.
If counted, see "Problem" and
"Action" columns.
• CRC errors
• Symbol errors
3
According to the failure
statistical information displayed
by the show interfaces
command, check to see if the
statistical information below is
counted for the port.
If counted, see "Problem" and
"Action" columns. [IP8800/
S3600] [IP8800/S2400]
• TX fault
4
Check to see if the combination
of transceivers is valid when
using the 1 core optical cable
such as 1000BASE-BX.
5
According to the failure
statistical information displayed
by the show interfaces
command, check to see if the
statistical information below is
counted for the port.
If counted, see "Problem" and
"Action" columns.
• Long frames
6
Check to see if statistics in the
following is not counted by the
show qos queueing
command. If it is counted, see
"Problem" and "Action"
columns.
• discard_pkt
3.4.5

Actions against Troubles on 10GBASE-R

If a trouble occurs on 10GBASE-R, follow the procedure below to isolate the problem.
1. Checking log
For the log, see the manual "Message Log Reference."
Problem
Line quality on
Check the type of fiber optics. For the mode, see "Hardware Installation
receiving side is
Guide."
degraded.
Check the attenuation value if an optical attenuator is used. For the
optical level, see "Hardware Installation Guide."
Check the cable length. For the cable length, see "Hardware Installation
Guide."
Check to see if the cable is connected correctly. Check to see if end
surfaces of the cable are dirty. If they are dirty, remove the dirt.
Check to see if the transceiver is connected correctly.
Use the same values as the remote system in configuration commands
speed and duplex.
Follow the segment standard on the remote system.
Check to see if the optical level is correct. For the optical level, see
"Hardware Installation Guide."
Perform the line test on this system and confirm that there is no problem
in the receiving function. See the execution results of the no test
interfaces command and follow the indicated actions. For the test
type to be specified, see
Transceiver is
Replace the transceiver.
faulty.
Combination of
For 1000BASE-BX, use U type and D type transceivers in pairs. Check
transceivers is
to see if the transceiver type is correct.
invalid.
Packets with
Follow the jumbo frame setting on the remote system.
invalid frame
length are received.
Packets are being
Review the system maintenance using discard control and shaper.
discarded.
3.
Troubleshooting Functional Failures in Operation
Action
"6.1 Testing
Line."
33

Advertisement

Table of Contents
loading

Table of Contents