T
Test width parameter, 3–27
Testing after installation, 2–29
Testing vertical alignment, 3–27
Tests, diagnostic, 3–34, 4–2
Text command set, 1–11
Timeout suppression parameter, (coax only),
3–24
Top–of–form, 2–24
Turning printer on, 2–13
Twinax configuration menu, 3–8
Twinax interface, 1–6
Twinax interface, setting printer address,
2–14
U
Underline test, 3–36
Unpacking a new printer, 2–5
Updating saved configuration, 3–32
V
Valid FF location parameter, (coax only),
3–23
Vertical alignment, testing, 3–27
Index–5