Existing Fireplace Preparation - Pacific energy BROADWAY Installation And Operating Instructions Manual

Direct vent gas insert
Table of Contents

Advertisement

The Broadway and Brentwood Gas inserts are certi ed to be installed into pre-existing approved re place
cavities. The minimum cavity requirements are listed in Figure 21below.
Dimension
Broadway
A
13"
B
21"
C
26"
Before installing the Broadway or Brentwood inserts have the chimney swept and replace, including ash
dumps and clean outs, cleaned to remove any creosote and soot residue that may cause odors and stains
after the insert has been installed. The replace chimney should be in good working order and made of
non-combustible material. Make sure chimney cleanouts
When preparing an existing replace to install a gas insert, any modi cations that will compromise the
integrity of the existing replace are not allowed. To make way for the insert's venting the replace ue
dampener may be blocked open or removed. Refractory, glass doors, screen rails, screen mesh and log
grates can be removed from the replace before installing the insert. Also, smoke shelves, shields and
baf es may be removed if attached by mechanical fasteners. Cutting any sheet metal parts of the replace,
in which the gas replace insert is to be installed, is prohibited.
If the factory-built replace has no gas access hole(s) provided, an access hole of 1.5" (37.5mm) or less
may be drilled through the lower sides or bottom of the rebox in a proper workmanship like manner. This
access hole must be plugged with non-combustible insulation after the gas supply line has been installed.
5055.66-B

Existing Fireplace Preparation

Brentwood
15"
23"
34"
Figure 21: Cavity dimensions.
t properly.
16
BDWY.BODYB
230216-44
BRNT.BODYB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brentwood

Table of Contents