IBM Series 1 User Manual page 41

Hide thumbs Also See for Series 1:
Table of Contents

Advertisement

2-26
either
1)
does
not
become
active with service gate
active, or 2) does not deactivate after it
has
become
active,
then
a
machine
check occurs and the channel
activates
the
Halt
or
MCHK
line.
If
the
device
attachment adheres to the specified times over which it
has control, the total duration of the sequence will be
within this channel timeout under normal operation.
GA34-0033

Advertisement

Table of Contents
loading

Table of Contents