Profire V Burner
INSTALLATION CHECKLIST
1.
All burners are carefully assembled and tested at the
factory, but before being placed in service all connectors
should again be checked for looseness caused during
shipment.
Check:
a. Electrical terminals in the control panel and on all
electrical components.
b. Pipe fittings and unions.
c. Tubing connections.
d. Nuts, bolts, screws.
2.
Open all necessary oil shutoff valves. Do not run pumps
or fuel unit without oil.
3.
Before connecting electrical current to any component,
be sure the voltage is the same as that specified on com-
ponent nameplates.
4.
Before burner operation, be sure all motors are rotating
in the proper direction.
5.
Before firing, make sure the burner firing head and dry
areas of the boiler are protected with refractory. The
burner mounting flange must be properly sealed against
the vessel front plate.
6.
Make certain that the operator in charge is properly
instructed in operation and maintenance procedures.
750-177
Figure 2-7: Typical Flooded Loop System
! DANGER
BEFORE OPENING THE MANUAL GAS SHUTOFF
VALVES, READ THE REGULATOR INSTRUC-
TIONS CAREFULLY. THE INSTRUCTIONS ARE IN
THE REGULATOR BOX. FOLLOW THE MANU-
FACTURER RECOMMENDATIONS. OPEN SHUT-
OFF VALVE ON THE INLET SIDE OF THE
REGULATOR SLOWLY AND CAREFULLY TO
ALLOW INLET PRESSURE TO BUILD UP
SLOWLY IN THE REGULATOR UNTIL IT IS FULLY
PRESSURIZED. OPEJNING THE SHUTOFF
VALVE QUICKLY WILL DAMAGE THE REGULA-
TOR. DO NOT EXCEED THE REGULATOR PRES-
SURE RATINGS.