Cub Cadet RT 75 Shop Manual page 38

Hide thumbs Also See for RT 75:
Table of Contents

Advertisement

RT 75
10.
Assemble the wheel shaft and the neutral assembly.
10a. In the middle of the wheel shaft there is a sec-
tion that is splined. On one side of the splines
there are two snap ring grooves. On that side,
install a snap ring in the grove closest to the
splines. See Figure 6.19.
10b. Slide the worm gear onto the wheel shaft so
that it rests against the snap ring, on the side
opposite of the splines.
NOTE: The dog clutch side of the worm gear must
face the splines when it is installed.
See Figure 6.20.
10c. Install a snap ring in the groove next to the
worm gear.
10d. Slide the dog clutch collar onto the spline side
of the wheel shaft, with the dogs facing the
worm gear. See Figure 6.21.
34
Snap ring grooves
Worm gear bearing surface
Figure 6.19
Dog clutch
Figure 6.20
Dogs
Dog clutch collar
Figure 6.21
Dog clutch side

Advertisement

Table of Contents
loading

Table of Contents