(2) Air-compressed device (optional) installation
Connect the air hose
to the manifolder block of the filter regulator and solenoid valve.
Connect the air hose
to the upper fitting of the air-compressed cylinder and the left side of the solenoid valve A.
Connect the air hose
to the lower fitting of the air-compressed cylinder and the right side of the solenoid valve A.
Connect the air hose
to the suction pipe and the solenoid valve B.
Connect the air hose
to the cutter cylinder and the solenoid valve C.
Connect the cable
which is written in PF linking to the control box to the solenoid valve A.
Connect the cable
which is written in CL linking to the control box to the solenoid valve B.
Connect the cable
which is written in TT linking to the control box to the solenoid valve C.
After installing to the table, open the air-compressed regulator
0.4~0.5 bar.
of the filter regulator and set the compressed air at the