Disassembling And Reassembling The Unit; Disassembly Sequence Flowchart; Assembly/Disassembly Procedures - Motorola IDEN I580 Field Service Manual

Basic and field level test procedures digital multi-service, data-capable portable
Hide thumbs Also See for IDEN I580:
Table of Contents

Advertisement

7.5

Disassembling and Reassembling the Unit

Motorola recommends the service technician follow a prescribed disassembly sequence to access
specific items or components of the unit. This product is an efficiently designed package that
incorporates the physical overlap and integration of some modular components. Refer to the
Disassembly Sequence Flowchart for a suggested path to reach specific components.
NOTE: In some cases, the technician may not need to remove certain components to reach others.
7.6

Disassembly Sequence Flowchart

Battery Cover
Battery
Back Housing
Front Housing with
Flip Assembly
Main Keypad
Flip Assembly
7.7

Assembly/Disassembly Procedures

NOTE: Installation procedures to be performed in reverse of disassembly except where noted.
Screws used to assemble the i580 are: 1 antenna screw, T-4 drive; 6 housing assembly screws, four
T-6 drive, two T4 drive.
68P80401P05
PREPARING FOR FIELD LEVEL TESTING: Disassembling and Reassembling the Unit
Antenna Assembly
SIM Card
Audio Jack Seal
Main Board
Assembly
Accessory Connector
Seal
47

Advertisement

Table of Contents
loading

Table of Contents