Download Print this page

HeliArtist B0105 Instruction Manual page 5

Hide thumbs Also See for B0105:

Advertisement

Tighten the wood blocks to the Heli assembly
using M2x20mm screws with 2x20mm washers.
Reinstall the screw which is took out of previous
step back to the tail system and tighten all screws
now. Then assemble the Heli's tail gear box onto the
short tail boom of the scorpion tail system.
Drill two 1.5mm holes onto the Tail Cover as shown
above. Then assemble two Linkage Regulators to
these holes.
Insert the Heli assembly into the fuselage.
Secure the Heli assembly through the wood blocks
using four 2x12mm Self-Tapping Screws.
Tighten the Linkage Regulators with M2 nuts.
5

Advertisement

loading

Related Products for HeliArtist B0105