Download Print this page

Carrier 59SP5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 17

100 series

Advertisement

If alternate vent position
is required, loosen clamp
on vent elbow inlet.
Remove trap from collector
box.
Remove relief tube from
relief port on condensate
trap.
Remove front pressure
switch tube and discard.
(_)
emove relief tube
from port on collector
box.
(1 AND 2 STAGE UNITS)
Remove middle and right
plug from collector box.
ii
Unconverted
Factory
Trap Configuration
As Viewed
in the Horizontal
Left Orientation
(_
otate elbow to
desired position
and torque clamp
on inlet 15 lb.-in.
Install plug in open
ports on collector box.
Connect relief tube to port
on collector box.
(_
Slide relief tube in
stand-offs to adjust
length.
Connect tube from Loose
Parts bag to port on front
pressure switch.
(_
ttach condensate
trap with screw to
collector box.
(_
Align trap over middle
and right-hand port on
collector box.
(1 AND 2 STAGE UNITS)
Route pressure switch tube
underneath relief tube and
connect to port on
collector box.
Connect relief tube to relief
port on condensate trap.
Horizontal
Left Trap Configuration
Fig. ll - Horizontal
Left Configuration
Al1282
17

Advertisement

loading