Download Print this page

Carrier 59SP5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 15

100 series

Advertisement

Remove relief tube from relief
port on collector trap.
Remove trap from
collector box.
Remove pressure switch tube from
front pressure switch and discard.
,'_
Remove tube from relief port.
Loosen clamp on inlet
to vent elbow.
(1 and 2 Stage Units)
Remove middle and bottom
plugs.
DO NOT DISCARD.
ii
Unconverted
Factory
Configuration
As Viewed
in the Downflow
Orientation
Connect tube from Loose Parts bag
to port on front pressure switch.
Route tube through inducer
stand-offs.
(_)
Install plugs in
open ports on
collector box.
Trim excess tube.
Connect pressure switch
tube to port on collector
box.
(_
Connect relief tube
to port on collector
box.
Attach condensate trap
with screw to collector box.
Rotate elbow to
desired position and
tighten clamp to
15 lb.-in.
(_
Slide tube in stand-offs
to adjust length.
(1 and 2 Stage Units)
Connect relief tube to
relief port on condensate
trap.
Align condensate
trap
over middle and bottom
ports of collector box.
Downflow
Trap Configuration
Fig. 9 - Downflow Trap Configuration
Al1280
15

Advertisement

loading