Secure the system by fastening four screws to the rack on
the front panel.
•
Install a shelf supplied by the rack manufacturer on top of
which the RMX is placed. Secure the system by fastening
four screws to the rack on the front panel.
— Place the RMX 2000 on a secure, flat and clean surface.
9
Connect the following cables to the RMX rear panel:
•
Do not remove the protective caps from LAN1, LAN3 and ShMG
ports.
•
To maximize conferencing performance, especially in high bit
rate call environments, a 1Gb connection is recommended.
— Power cable - insert the connector firmly into the socket so that
almost all of the narrow section of the connector is inserted.
— LAN cable to the LAN 2 port.
— E1/T1 Cables to PRI ports (if applicable)
First Entry Power-up
10 Insert the USB key with the modified IP addresses in the USB port
on the back panel.
11 Power the RMX ON.
The parameters in the lan.cfg file are uploaded from the USB key to
the RMX's memory and applied during the power-up sequence.
System power-up sequence may take up to five minutes.
During the first-time power-up the red ERR LED on the RMX's
front panel remains ON until both the Management and IP
Network Services have been defined.
When the RMX's configuration is completed (including the
Management and IP Network Services), and if there are no System
Errors, the green RDY LED on the CNTL module (on the RMX's
front panel) turns ON.
4
Need help?
Do you have a question about the RMX 2000 and is the answer not in the manual?
Questions and answers