Start Your Server - IBM Netfinity 6000R User Reference Manual

Hide thumbs Also See for Netfinity 6000R:
Table of Contents

Advertisement

Start your server

1.Service availability will vary by country. Response time will vary depending on the number and nature of incoming calls.
6
IBM® Netfinity® 6000R User's Reference
Error codes and messages
Integrated service processor subsystem provides control for remote system
management
Light Path Diagnostics™ (LED panel)
Processor serial number access
Standard cables present detection
Standby voltage for system management features and monitoring
System error logging (POST and Netfinity Advanced System Management
Processor)
Vital Product Data (VPD) on microprocessors, system board, power supplies,
hot-swap-drive backplane, and power backplane
Customer support center 24 hours per day, 7 days a week
Use the following procedure to start your server.
1. Turn on all external devices, such as the monitor.
After you plug the power cords into outlets, wait 20 seconds before
Note:
pressing the power-control button. During this time, the system-
management processor is initializing and the power-control button does
not respond.
2. Press the power-control button on the front of the server. The power-on light
comes on and the power-on self-test (POST) begins.
The server can be turned on in several ways:
You can press the power-control button on the front of the server to turn on the
server.
Note:
If you have just plugged the power cords of your server into an
electrical outlet, you will have to wait approximately 20 seconds before
pressing the power-control button.
If the server is turned on and a power failure occurs, the server will start
automatically when power is restored.
The Netfinity Advanced System Management Processor also can turn on the
server.
1

Advertisement

Table of Contents
loading

Table of Contents