Rack Mounting Instructions - IBM Netfinity 6000R User Reference Manual

Hide thumbs Also See for Netfinity 6000R:
Table of Contents

Advertisement

• Review the documentation that comes with your rack enclosure.
• Maintain 15 cm (6 in.) of clearance around your server for air circulation.
• Ensure the room air temperature is below 35°C (95°F).
• Plan the server installation working from the bottom of the rack up.
• Remove the rack doors and the side panels during the installation, if necessary.
• Position the template to the rack so that the edges of the template do not
overlap any other devices to be installed.
• Do not place any object weighing more than 50 kg (110 lbs.) on top of
rack-mounted devices.
• Use safe practices when lifting.
• Install the heaviest device in the bottom of the rack.
• Do not extend more than one device out of the rack.
• Connect all power cords on the server and on other devices to properly wired
³
50
kg (110.5 lbs)
and grounded electrical outlets.
• Take precautions to prevent the rack from overloading the power outlets when
you install multiple devices in a rack.
³32 kg (70.5 lbs)
The following is a list of items shipped in your rack installation kit. If any items are missing or
damaged, contact your place of purchase.
• Cable clamps (10)
• Cable-management assembly
• Cable-retainer bracket
• Cable straps (6))
• Cage nuts (12)
• Cage-nut-insertion tool
1
Use the attached stickers to mark the holes on
the front and the rear of the rack in the
locations indicated by the arrows on the
template.
180
IBM® Netfinity® 6000R User's Reference

Rack Mounting Instructions

• Clip nuts (12)
• Hinge bracket
• Hinge pin
• Screw packages (2)
• Slide rails (2)
T
e
m
p
l
a
t
e
2
Cage
nuts
Cage
nuts
Use the cage-nut-insertion tool or
screwdriver
to insert the cage nuts, or s
the clip nuts,
as required for your rack, into all
the marked holes.
Clip
nuts
a
lide on

Advertisement

Table of Contents
loading

Table of Contents