IBM® xSeries 150: Installation Guide

Rack Mounting Instructions

• Review the documentation that comes with your rack enclosure.
• Maintain 15 cm (6 in.) of clearance around your server for air circulation.
• Ensure the room air temperature is below 35°C (95°F).
• Plan the server installation working from the bottom of the rack up.
• Remove the rack doors and the side panels during the installation, if necessary.
• Position the template to the rack so that the edges of the template do not
overlap any other devices to be installed.
• Connect all power cords on the server and on other devices to properly wired
and grounded electrical outlets.
• Take precautions to prevent the rack from overloading the power outlets
when you install multiple devices in a rack.
• Do not place any object weighing more than 50 kg
(110 lbs.) on top of rack-mounted devices.
• Use safe practices when lifting.
³
50
kg (110.5 lbs)
The following is a list of items shipped in your rack installation kit. If any
items are missing or damaged, contact your place of purchase.
• Cable-management assembly
• Cable straps (7)
• Cable ties (10)
• Cage nuts (12)
1
T
e
m
p
l
a
t
e
Use the attached stickers to mark the holes on
the front and the rear of the rack in the
locations indicated by the arrows on the
template.
³32 kg (70.5 lbs)
• Clip nuts (12)
• Screw packages (2)
• Slide rails (2)
2
Cage
nuts
Use a screwdriver or the cage-nut-insertion
tool to insert the cage nuts, or s
nuts,
as required for your rack, into all the
marked holes.
Clip
nuts
Cage
nuts
lide on the clip