Dismounting Transmission and Engine One Piece Assembly
1. Remove the universal joint mounting screw and disconnect the
universal joint (4) from transmission.
2. Set the power train support (5) and remove the mission frame (3)
mounting bolt (2) and nut.
3. Lift up the main frame by hoist.
4. Remove the transmission and engine one piece assembly (4).
(When reassembling)
• Align the master spline (A) of 4WD propeller shaft and universal
joint.
• The bolt can be put through the rubber bushing more easily if
soap water is applied to the bolt. Never hit the bolt.
• Assemble the mission frame in such a manner as to insert two
bolts in the front and then two bolts in the rear, instead of
inserting the four bolts at a time.
• When reassembling the transmission and engine one piece
assembly (mission frame) into the main frame, do not forget to
assemble the 4WD propeller shaft (1) with universal joint (4) as
well.
• Apply grease to splines of 4WD propeller shaft (1) and splines of
universal joint (4).
Mission frame mounting
bolt and nut
Tightening torque
Universal joint mounting
screw
(1) 4WD Propeller Shaft
(2) Mission Frame Mounting Bolt
(3) Mission Frame
(4) Universal Joint
Power Steering Hose and Radiator Hose (Lower)
Here after, refer to WSM No. 97897-15320 of RTV900, which
serves as basis.
9-S8
NEW TRANSMISSION
29.4 to 49.0 N·m
3.0 to 5.0 kgf·m
21.7 to 36.1 ft-lbs
23.6 to 27.4 N·m
2.4 to 2.8 kgf·m
17.4 to 20.2 ft-lbs
(5) Transmission and Engine One Piece
Assembly
(6) Power Train Support
(A) Master Spline
W1015698