Kubota RTV 900 Workshop Manual page 21

Hide thumbs Also See for RTV 900:
Table of Contents

Advertisement

RTV900, WSM
4. CONTROL LINKAGE FOR BYPASS VALVE
(1) Bypass Valve
(2) Bypass Link 2
The upper link that activates the bypass valve is operated manually (by pulling the VHT pressure release knob)
and linked by a cable in order to activate the bypass link 2 (2).
In addition, the lower lever has been linked to a brake lever so that it may interlock with the foot brake when this is
activated, and the bypass link 1 (3) has been linked by a spring (4).
The bypass circuit will not be created even if you activate the VHT pressure release knob unless you apply the
brake and stop the unit.
(3) Bypass Link 1
(4) Spring
(5) VHT Pressure Release Cable
9-M12
NEW TRANSMISSION
(6) Brake Cam Lever
KiSC issued 04, 2006 A

Advertisement

Table of Contents
loading

Table of Contents