Cushman 632904 Service Manual page 117

48v electric powered utility vehicle
Table of Contents

Advertisement

Read all of Section B and this section before attempting any procedure. Pay particular attention to Notices, Cautions, Warnings and Dangers.
Axle Shaft Replacement
Carefully insert the axle shaft and bearing through the
oil seal. Rotate the shaft until the spline engages with
the differential side gears. Install the outer snap ring.
Coat the outboard spline of the axle with a commer-
cially available anti-seize compound. Install the brake
hub and drum, thrust washer, nut and new cotter pin
(Ref. Fig. 8).
Fig. 7 Installing Seal
Tighten the castellated axle nut to 70 ft. lbs. (95 Nm) torque
minimum, 140 ft. lbs. (190 Nm) torque maximum. Continue to
tighten until the slot in the nut aligns with the cotter pin hole.
Fig. 8 Cut Away of Outer Bearing and Brake Drum
Repair and Service Manual
REAR AXLE
NOTICE
Thin Thrust
Washer
Cotter Pin
Spline
Thick Thrust
Washer
Axle Nut
Brake Drum
B
B
Inner Snap
Ring
Bearing
Outer
Snap Ring
Page K-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents